Project summary: The owner initially planned to construct an addition attached to the front of the building. At a ZBA hearing on September 27, 2018 the developer requested a continuance, however the project was placed on hold.
Carnegie Mellon University purchased the property in September 2019. There are no plans — aside from general cosmetic/code updates to the exterior — for the property at this time.