Ward Street

3339 Ward Street

Proposed conversion of an office building to a 19-unit residential building. Paramount Construction presented preliminary plans for the project at the November 30, 2021 Oakland-Wide Meeting, requesting residents’ feedback on the design. Paramount returned on December 11, 2023 with updated plans.

Status Updates:

05/15/2024: Paramount Construction is in the process of scheduling a hearing with the Pittsburgh Zoning Board of Adjustment. The company expects to secure a date within the next couple of months. Once finalized, the date will be posted.

Resources:

3247 Ward Street

Developer: OPA-HI Development LLC

Project Summary: The owner of the vacant lot at 3247 Ward St originally proposed splitting the property into two parcels and building a single family house facing Ward and a duplex facing Hardie Way. The project was granted a continuance at the December 13 Zoning Board of Adjustment hearing due to a lack of community process. After hearing concerns from residents, the developers are now proposing to split the lot and build two single family homes; one facing Ward St and one facing Hardie Way.

The project has since been revised so that both dwellings have a front entrance on Ward St. The developers requested side setbacks at a ZBA hearing on May 16, 2019 (see page 9 of the agenda). The requested variances were denied on July 18, 2019 (see the decision below).

Project resources: